Triple Leak / Pressure Test; Deep Evacuation Test - LG LS243HLV Installation Manual

Hide thumbs Also See for LS243HLV:
Table of Contents

Advertisement

FINAL INSTALLATION PROCEDURES

Triple Leak / Pressure Test

Triple Leak / Pressure Check Procedure, continued.
7. If the pressure does NOT drop for one (1) hour, the system passes the test.
8. If the pressure drops, there is a leak and it must be found. Remove the bubble solution with a clean cloth, repair the leak(s), and perform
the leak / pressure check again.
9. After the system has been thoroughly tested and no leaks are found, depressurize by loosening the charging hose connector at the nitro-
gen cylinder regulator. When system pressure returns to normal, completely disconnect the charging hose from the cylinder, and release
the nitrogen charge from all refrigerant piping. Wipe off any remaining bubble solution with a clean cloth.
Deep Evacuation Procedure
After the leak / pressure check is complete, its is required that a deep evacuation procedure is be performed to the refrigerant piping and the
connected indoor unit. Deep evacuation must be performed through the gas (vapor) suction line Schrader port on the outdoor unit service
port.
The deep evacuation procedure is required for Single Zone systems. A triple evacuation procedure seen on the previous page is a best practices
recommendation for Single Zone systems.
before operating the system.
• Deep evacuate through just the gas (vapor) suction Schrader port on the outdoor unit service port.
• The outdoor unit service valves must remain closed and the stem head access caps tight.
and release the factory refrigerant charge until trim charge is complete, and the system is ready to operate.
• Any field-installed ball valves in the refrigerant system (if used) must be open to ensure all piping is free and clear for deep evacuation on
all piping and the connected indoor unit.
Do not apply power to the system before performing the deep evacuation procedure. There is a possibility that the EEV valve may close
and isolate sections of the piping system, making the deep evacuation procedure inconclusive.
Never perform evacuation using refrigerant.
• Subsequent oil changes will be necessary after several hours of continuous operation; have extra oil on hand.
• Use a quality micron gauge in good operating order and install as far away from pump as possible.
Deep Evacuation Procedure Steps
1. If this procedure is performed shortly after the leak / pressure test, the cap and core on the gas (vapor) suction Schrader port must have
already been removed, and the manifold must already be connected. If the procedure was not performed shortly after the leak / pressure
test, make sure to remove the cap and core on the gas (vapor) suction Schrader port. Verify that the service valves on the outdoor unit
are closed, and the stem head access caps are tight.
2. Connect the gauge manifold along with the vacuum pump to the gas (vapor) suction Schrader port (with core removed) using a vacuum
hose. Open the gauge manifold and the vacuum pump valves.
52
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Do not open the outdoor unit service valves

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls303hlvLs363hlv

Table of Contents