Short Term Storage - Titan CONTROL PRO 190 Owner's Manual

Table of Contents

Advertisement

Short-tErM StorAGE
This procedure should be used when taking a short
i
term break or when ending your project for the day.
If your break is longer than 16 hours follow Cleanup
instructions, pages 18-19.
YoU wIll nEED
Water
Plastic bag
Damp rags
Stir stick
Instructions are for latex materials only! If using oil
i
based material follow instructions for Cleanup on
pages 18-19.
ShUtDown
1.
Perform the Pressure relief Procedure, page 10.
2.
Turn spray tip 90º. This will prevent air from drying out any
spray material that may be inside the spray tip. Wrap spray
tip in a damp rag and then place entire spray gun in plastic
bag.
3.
Pour 1/2 cup water slowly on the top of the paint to prevent
the paint from drying.
Place the entire spraying system out of the sun.
StArtUp
4.
Remove the spray gun from the plastic bag or the water. Turn
the spray tip back to the spraying position.
5.
If water was added during shut down, stir water into material
with the stir stick.
6.
Follow Spraying instructions, page 12.
5
1
2
3
4
6
pAGE 12
En
AnD
AnD
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Control pro 170

Table of Contents