6.0 Boiler operation
Before operating the appliance, there are some important pre-igntion checks that need to be
performed. For more information, see
boiler start-up process, see
at start-up, see
Cleaning the sight glass on page
6.1 Lighting and shutting down the boiler
Followed lighting and shutting down procedure.
Tested the ignition safety shutoff function (see
76).
Checked the appliance's fuel source, and if necessary,
the appropriate P-kit.
Performed gas pressure test by
Before operating the boiler on page
Sequence of Operation on page
98.
Start-up Checklist
Testing the ignition safety shutoff on page
measuring the inlet gas
75
73. To understand the
116. If the sight glass viewport clouds up
performed a fuel conversion
pressure.