Clearances - Baxi Heat 613 User Manual

Gas fired wall mounted condensing boiler
Hide thumbs Also See for Heat 613:
Table of Contents

Advertisement

3
Technical Specifications
At least
1.5°
Fig. 1
At least
1.5°
Fig. 2
12
600 Heat
500mm Min
For Servicing
Purposes
270mm
5mm Min
In Operation
500mm Min
For Servicing
Purposes
5mm Min
In Operation
3.1.1.

Clearances

1. A flat vertical area is required for the installation of the boiler.
2. These dimensions include the necessary clearances around
the boiler for case removal, spanner access and air movement
(Figs. 1 & 2). Additional clearances may be required for the
passage of pipes around local obstructions such as joists
running parallel to the front face of the boiler.
5mm Min
370mm
370mm
5mm Min
5mm Min
190mm
625mm
35mm Min
in Cupboard
120mm Min
5mm Min
35mm Min* in
cupboard (cut-outs
required for
pipework)
85mm Min* below
ceiling (allows
access to
compression
fittings on pipe)
625mm
35mm Min
in Cupboard
120mm Min
7726861-01 (1/19)

Advertisement

Table of Contents
loading

Table of Contents