2. Remove a screw (D) to remove the Ballast Barrier-A3 as shown in
Fig. 4-6-6.
3. Remove a screw (E) to remove the Ballast Barrier-A4.
4. After remove a screw (F), release 3 Locking Tabs to remove the
Main Power C.B.A. as shown in Fig. 4-6-6.
Assembly Note:
Make sure that all cables and leads are placed in their original position as shown in Fig. 4-6-5.
4.6.4. Removal of the System Power C.B.A.
1. Remove the Ballast Barrier-A1.
After remove a screw (G), unlock 3 Locking Tabs to remove the
System Power C.B.A. as shown in Fig. 4-6-7.
PDF created with pdfFactory Pro trial version
Fig. 4-6-6
Fig. 4-6-7
37
www.pdffactory.com