Weil-McLain 4 Series Manual page 31

Steam boiler
Hide thumbs Also See for 4 Series:
Table of Contents

Advertisement

sTeam series
94
Figure 21 Water level control locations
M3
M3
J1
J1
Secondary
water
level
control
J5
J5
Bottom of
Bottom of
gauge glass
gauge glass
M4
M4
Blowdown
Blowdown
valve
valve
Normal water line
is at the center of
the gauge glass
LEFT
SIDE
O N D
S E C
550-100-157/0523
boiler manual
4
M1
M1
A
B
M2
M2
RIGHT
SIDE
A R Y
P R I M
A R Y
Primary
Casting line
Water
height above
Primary
Level
bottom of
water
Control
gauge glass
level
control
Note 1
61, 63
Blowdown
Blowdown
valve
valve
93, 193, 94
(Note 3)
51-2
51-S-2
1"to 1-1/4"
(Note 3)
Notes:
1
Other manufacturers' controls providing similar functions
may be used if properly located and selected
2
Use LWCO function only Pump controller function must
only be handled by the primary control
3
When the pump control is used with a feedwater tank,
install the pump control on the boiler and the makeup
water feeder on the tank Use a separate LWCO on
the boiler when back-up is needed Do not install a
combination LWCO with feeder as a back-up control on
boiler The feeder will operate before the pump control
operates
Lowest Acceptable
Operating Water Level
1/4" above bottom of
Lowest Permissible
Water Level 1" below
visible portion of
230055
insTallaTion
Backup
Casting line
Water
height above
Level
bottom of
Control
gauge glass
"A"
Notes 1, 2
1/4"
None
1/2"
61, 63
2"
None
2"
93, 193, 94
2"
61, 63
51-2
(1494 to
1594 only)
2"
– or –
51-S-2
(all sizes)
None
Gauge Glass
Gauge Glass
550-430-732_0113
1
2
"B"
1/4"
3
1/4"
1/4"
4
1/4"
5
6
7
8
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

149415941694179418941994

Table of Contents