Filling The System; Completing The Installation; Completion - Main Eco Compact Heat 15 Installation And Service Manual

Condensing central heating boiler
Table of Contents

Advertisement

6
Installation
6.3

Filling the System

6.4

Completing the installation

40
Eco Compact Heat
See Section 5.2.6. for details of treating the system,
Section 5.2.7. for open vent system details, Section 5.2.9. for
sealed system details and Section 5.4.4. for filling the
condensate trap.
6.4.1

Completion

1. Before turning on the electrical and gas supply to commission
the boiler, check that all the installation requirements for the
chosen heating system and flue options have been satisfied.
2. Ensure that the system is vented to expel any excess air.
7726859-01 (1/19)

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Eco Compact Heat 15 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF