Step
7.Remove vertical louver
a
Loosen the connection clasps between
vertical louver and bottom case to
remove vertion louver.
b
Screw off the screws that are locking the
swing motor and take the motor off.
8.Remove electric box assy
Loosen the connection clasps between
a
shield cover of electric box sub-assy and
electric box,and then remove the shield
cover of electric box sub-assy.
Remove the screw fixing electric box
assy.
① Cut off the wire binder and pull out
b
Cut off the wire binder and pull out the
the indoor tube temperature sensor.
indoor tube temperature sensor.
Screw off one grounding screw.
② Screw off one grounding screw.
Remove the wiring terminals of motor and
③ Remove the wiring terminals of motor
stepping motor.
and stepping motor.
Remove the electric box assy.
④ Remove the electric box assy.
Screw off the screws that are locking each
lead wire.
⑤ Screw off the screws thar are locking
each lead wire.
88
Procedure
Indoor tube
temperature s ensor
G rounding
screw
Wire binder
Service Manual
Swing motor
Main
board
Wiring
terminal
of motor
Wiring
terminal
of stepping
motor
Screw
Installation and Maintenance