3m, please refer to the real meter). • The whole meter installation illustration: Note: during the installation, please install the joint for inlet temperature sensor into the base meter of ultrasonic heat meter. RLBC SERIES ULTRASONIC HEAT METER...
Page 4
(1) The inlet probe protecting tube is installed on the meter body before leave factory, only need to install outlet probe. (2) When welding the base of meter, please upward the internal threaded end, and weld the non-threaded end. RLBC SERIES ULTRASONIC HEAT METER...
Upper case body Upper case body Three-core cord Six-core cord Protective cover Pipeline Pipeline ① ② Upper case body Upper case body Three-core cord Six-core cord Extension cord Protective cover Connector Upper case Pipeline Pipeline ③ ④ RLBC SERIES ULTRASONIC HEAT METER...
Second address: the last 8 digits of meter ID number. For example: the meter printing is "ID: 201511293058", then the second address is 11293058. RLBC SERIES ULTRASONIC HEAT METER...
Page 7
The used heat power of the last 23 months: Total XXX kW·h The used flow rate of the last 23 months: Total XXX.XX m It will come back to normal working status after display the 24 months info. RLBC SERIES ULTRASONIC HEAT METER...
1 Pair 1 Piece (Inside ultrasonic 1 Pair 1 Piece 2 Pieces 4 Pieces 1 Piece heat meter) QUALITY GUARANTEE Standards: GB/T 32224-2015 Heat meter GB/T 26831 Community energy measurement and collection data system specification RLBC SERIES ULTRASONIC HEAT METER...
Page 9
Do not short circuit batteries. Do not put the battery close to flame or water.. Do not overheat or solder the batteries. Do not subject the batteries to severe physical shocks. Note: The manual is for reference only and is subject to change without notice. RLBC SERIES ULTRASONIC HEAT METER...