Finalizing And Verifying The System Configuration - Hitachi 3090 G2 Hardware Reference Manual

Nas platform
Hide thumbs Also See for 3090 G2:
Table of Contents

Advertisement

This step requires a separate process, training, and license keys. Contact Hitachi if
the incorrect model arrives for replacement.
11. Navigate to Home > Server Settings > Firmware Package Management to verify
and, if necessary, upgrade the new server to the latest SU release.
12. Navigate to Home > Server Settings > Cluster Wizard, and promote the node to
the cluster.
13. Enter the cluster name, cluster node IP address, subnet, and select a quorum
device.
Note that the node reboots several times during this process.
14. When prompted, add the second node to the cluster.
15. Enter the physical node IP address, log in as supervisor (default password:
supervisor), and click finish.
Wait for the system to reboot.
16. Enter smu-uninstall to uninstall the embedded SMU.
17. Navigate to Home > Server Settings > Configuration Backup & Restore, locate
the desired backup file, and then click restore.
18. Reconfigure the server to the previous settings:
IP addresses for Ethernet ports 0 and 1
Gateway
Domain name
Host name
The SMU should recognize the node as the same and allow it to be managed.
19. Navigate to Home > Server Settings > License Keys to load the license keys.
20. Repeat steps for any other replacement servers to be configured.

Finalizing and verifying the system configuration

On the new server:
Procedure
1. Navigate to Home > Status & Monitoring > System Monitor to verify the server
status:
Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference
Appendix A: Server replacement procedures
Finalizing and verifying the system configuration
106

Advertisement

Table of Contents
loading

This manual is also suitable for:

3080 g23080

Table of Contents