Download Print this page

Installation; Support Assembly - Titan 204 Installation, Maintenance, And Parts Manual

Advertisement

INTRODUCTION
The management and employees of Titan Industries thank you for specifying Titan equipment. This manual
will give you the basic information to install and maintain your equipment. If special circumstances or
questions come up call Titan at 920-982-6600.
I. RECEIVING
Upon delivery of your Titan conveyor, check the packing slip or bill of lading accompanying the unit. If any
components are missing, contact Titan IMMEDIATELY with a description of the missing components along
with the conveyor serial number(s). The serial number is found on the serial plate normally positioned by the
drive.
Check the unit(s) over carefully upon arrival for damage. If you find any damage note it on the bill of lading.
YOU MUST also file a claim IMMEDIATELY with the carrier.
II. INSTALLATION
WEAR SAFETY GLASSES, SAFETY SHOES, AND GLOVES.
HAVE AREA AROUND INSTALLATION SITE CLEARED OF DEBRIS.
LOCKOUT POWER TO CONVEYOR(S) UNTIL START-UP.
LOOK OUT FOR SHARP EDGES WHILE HANDLING CONVEYOR COMPONENTS.
BE CAREFUL IN AND AROUND THE CONVEYOR(S) DURING INSTALLATION.
ALSO, BE AWARE OF OTHERS IN THE AREA.
ONLY ALLOW QUALIFIED PERSONNEL TO ASSEMBLE AND INSTALL CONVEYORS.

SUPPORT ASSEMBLY

Standard supports are always shipped assembled. See FIGURE 1 for a component breakdown.
FIGURE 1
5
5/12

Advertisement

loading