Installation and commissioning
Read the system manual "S7-1500 Automation System"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1500 Automation System" (see section Documentation references
(Page 65)).
Make sure that the power supply is turned off when installing/uninstalling the devices.
NOTICE
No plugging and pulling during operation
The CM must not be pulled or plugged during operation.
Configuration
One requirement for the commissioning of the CM is the completeness of the STEP 7 project
data.
Procedure for installation and commissioning
Step
Execution
1
When installing and connecting up, keep to
the procedures described for installing I/O
modules in the system manual "S7-1500
Automation System".
2
Connect the CM to Industrial Ethernet via the
RJ45 jack.
Where necessary, connect another component
to the remaining free RJ45 jack.
3
Turn on the power supply.
4
Close the front covers of the module and keep
them closed during operation.
5
The remaining steps in commissioning involve
downloading the STEP 7 project data.
SIMATIC CM 1542-1
Operating Instructions, 04/2023, C79000-G8976-C355-05
WARNING
Installation, connecting up, commissioning, operation
Notes and explanations
Underside of the CM
The STEP 7 project data of the CM is transferred when you
download to the station. To load the station, connect the
engineering station on which the project data is located to the
Ethernet interface of the CPU.
You will find more detailed information on loading in the
following sections of the STEP 7 online help:
"Compiling and loading project data"
"Using online and diagnostics functions"