This unit is only suitable for installation as permanently connected equipment. The
PSU is NOT
SUITABLE for external installation. EQUIPMENT MUST BE EARTHED. Before installation,
ensure that external disconnect device is OFF. The PSU should be installed according to
all relevant safety regulations applicable to the application.
Mounting
1) Mount securely in correct orientation allowing minimum clearance – see diagram.
2) Route mains and low voltage output cables via different knockouts and/or cable
entry holes.
3) Use bushes and cable glands rated to UL94 HB minimum.
Mains Power Up
4) Attach correctly rated mains cable (minimum 0.5mm
fasten using cable ties.
5) Apply mains power. Check for 13.8V dc on load outputs. Check green Mains LED is
on.
6) Disconnect mains power.
Load Output
7) Attach correctly rated load cable and fasten using cable ties. Note polarity.
8) Apply mains power. Check green Mains LED is on.
9) NOTE: Red LED may be illuminated to indicate that no battery has been
connected. This is normal.
10) Verify load is operating correctly.
11) Disconnect mains power.
Standby Battery
12) Attach supplied battery cables to terminal block and battery.
NOTE: ensure correct polarity of battery connections: +ve use red lead, -ve use
black lead.
OMMISSIONING
PAK200467-HW_01A March 2020
2
[3A], 300/500V ac) and