3.0 INSTALLATION CODES Install the balanced flue system according to CSA S139 codes to ensure a safe operation of your unit. The following guidelines are included in the CSA codes and must be respected at all times: A) Use approved venting components only.
Page 4
• Within 1 ft (0.3 m) above grade (ground or any surface that will support snow). • underneath a deck, porch, or veranda • closer than 6 ft (1.8 m) from an inside corner of an L-shaped structure • In a location where the flue gases are directed at any opening of surrounding buildings that are within 6-ft (1.8 m).
Page 5
11. The back of the vent terminal is equipped with a flexible heat shield, bend the flaps to the side, and then bend the heat shield up, and out of the way. 12. Silicone caulk the space between the vent terminal and the structure.
Page 6
throughout this installation is critical to the operation of the balanced flue system. A tube of caulking is provided with the installation kit. This tube should be sufficient for the whole installation, but if more caulking is needed buy one of the following: GE 106, Dow Corning 736 Heat Resistant Sealant, Perimeter 248 High Temp or RTV Silicone Gasket.
7.0 WIRING All wiring must be in accordance with the Canadian Electrical code, CSA C22.2, and any local codes that may become applicable. Insure that the wiring is in accordance with this manual. The boiler must be electrically grounded in accordance with local codes, and C22.2. Important Warning It is the responsibility of the installer to ensure that: •...