Install The Cutting Line; Remove The Trimmer Head; Assemble The Trimmer Head - GreenWorks 82ST15 Operator's Manual

Table of Contents

Advertisement

Available languages

Available languages

EN
5. Align the spool tabs with the tab openings in the base of
the spool.
6. Push the spool cover until it clicks into position.
10.4

INSTALL THE CUTTING LINE

Do not put more than 26-ft of .095" line at a time.
1. Remove the remaining cutting line on the spool.
2. Line up the slot (16) on the spool cap with the line exit
hole (17) on the trimmer head.
3. Put the cutting line through the hole. Push the cutting line
until it exits the opposite hole.
4. Pull the cutting line through until there is an equal
quantity of cutting line on each side.
NOTE
16
17
English
5. Turn the spool cap clockwise to wind the cutting line into
the trimmer head. Keep approximately 5 in of cutting line
above out of each side of the trimmer head.
10.5

REMOVE THE TRIMMER HEAD

1. Put the metal rod (18) in the motor housing hole (19) to
fix the trimmer head.
2. Turn the trimmer head clockwise to loosen it. Do not
remove the impeller (20) from the shaft.
18
10.6

ASSEMBLE THE TRIMMER HEAD

1. Put the metal rod in the motor housing hole to fix the
trimmer head.
2. Assemble the trimmer head.
3. Turn the trimmer head counterclockwise to tighten it.
4. Remove the metal rod.
10
19
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents