Westinghouse wGenTent User Manual page 9

Generator running cover for open frame portable generators
Table of Contents

Advertisement

Available languages

Available languages

ASSEMBLY
NOTE: When installing frame rods for settings 2,3 & 4 the frame rod should
be put into the outermost hole. Setting 0 and 1 are the same clamp setting,
the frame rod hole for setting 0 is the inner one (closest to the generator) and
frame rod hole for setting 1 is the outer one (furthest from the generator).
Install Clamp on Generator Frame
h. Clamp direct to the generator's vertical frame post and
position the top edge of the rubber sleeve at one of the
following positions:
1. 9" below where the gas tank meets the frame, or
2. 1/2" below the lowest electrical outlet (whichever
location is lower on the generator frame).
i. Slip rubber sleeve around the vertical frame post, turning
the rubber sleeve so the opening faces away from the
generator. (Fig. 1.3) Select installations
may not allow the rubber sleeve mouth face
outward, this is Ok.
j. Push clamp opening straight onto frame,
below the rubber sleeve. (Fig. 1.4) Then
slide clamp up and over the rubber sleeve.
(Fig. 1.5) This allows you to install the clamp
without pulling the clamp mouth open.
k. Position clamp diagonally from generator
frame typically at 45 degrees.
l. Tighten the clamp knob, this usually requires
only 2-3 full turns once you feel resistance
against the clamp body.
m. Repeat procedure on remaining three
sides: position clamps at the same height.
NOTE: Over-tightening the clamp knob
should be avoided. If you notice the mouth of
the clamp pulling away from the vertical frame
post, you have over-tightened, and the knob
should be loosened.
FIG. 1.3
FIG. 1.4
FIG. 1.5
|
English
9

Advertisement

Table of Contents
loading

Table of Contents