Download Print this page

Operation - Wayne-Dalton DS-350 Installation Instructions Manual

Commercial roll-up doors

Advertisement

STEP 1
UNPACKING DOORS
Doors shipped by common carrier arrive at the job site packed in cardboard. Before removing the door from the
packaging, inspect the door and packaging for visible signs of damage. If damage is noted, file a freight claim with
the freight company immediately.
IMPORTANT!
No guarantee will be given by Wayne-Dalton if the door is not erected as instructed. For best operation, follow the
instructions step by step. Please review all instructions thoroughly before starting installation.
STEP 2
CHECK THE DOOR OPENING
Verify the opening measurements with the door packing slip. Consult the factory if the actual opening width varies
from that shown on the packing slip by more than 2 inches. Check door jambs, header, and floor for plumb/level
condition. Check that there is sufficient clearance at jambs and head (see Dimension Tables below).
NOTE:

OPERATION

PUSH-UP
DIRECT DRIVE CHAIN/MOTOR
REDUCED DRIVE CHAIN
DIMENSION TABLES - MINIMUM OVERHEAD CLEARANCE (B) INDICATED
4
Do not remove cardboard or cut tape that holds door in a roll.
You will be told later when to do this.
Left hand operated door shown above. Right hand is opposite.
A
OPENING HEIGHT
6"
UP TO 8' HIGH
9"
FROM 8' TO 10' HIGH
8"
OVER 10' HIGH
B
C
20"
10"
22"
11"
24"
12"

Advertisement

loading