Connecting-up
7.1.2

Power connections for 50 kW / 100 kW rectifier units

X1 – Mains
The mains connection is to a terminal block at the bottom of the unit.
connection
Terminal
PE
U1
V1
W1
W1 / L3
Connectable cross-section:
For 50 kW rectifier unit:
For 100 kW rectifier unit:
Terminal PE is at left as viewed from the front.
Table 7-4
X3 - DC link bus
The purpose of the DC link bus module is to supply the connected
module
inverters with the generated direct voltage.
Connectable cross-section: "Electro-plated copper" 3x10 mm, rounded
off according to DIN 46433.
Bar 1 is at the front when installed.
Table 7-5
DANGER
The current carrying capacity of the copper bars is 120 A.
The 100 kW feeder supplies 230 A and would overload the copper
bars. It is therefore provided with 2 busbar connections with a current
carrying capacity of 120 A each. These take the power to busbars on
the right and left of the rectifier unit. The current distribution is not
monitored. Measures must therefore be taken at the planning stage to
ensure that the current fed to each busbar does not exceed the
specified maximum.
7-6
Meaning
PE
Protective conductor connection
U1 / L1
Phase U1 / L1
V1 / L2
Phase V1 / L2
Phase W1 / L3
50 mm² (AWG 1/0)
95 mm² (AWG 4/0)
Mains connection
Bar
Designation
3
PE3
Protective conductor connection
2
D / L-
1
C / L+
DC link bus module
Operating Instructions
Range
3AC 380 - 480 V
3AC 380 - 480 V
3AC 380 - 480 V
3AC 380 - 480 V
Meaning
DC link voltage -
DC 510 - 650 V
DC link voltage +
DC 510 - 650 V
6SE7087-2NP85-0AA0
SIMOVERT MASTERDRIVES
05.2005
Range
Siemens AG

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Compact plus 6se7024-1ep85-0aa1

Table of Contents