Carrier 40MBAB Installation Instructions Manual page 9

Air handler unit ductless system
Hide thumbs Also See for 40MBAB:
Table of Contents

Advertisement

40MBAB: Installation Instructions
7. Remove the evaporator and drain pan then rotate 180° (when your
equipment needs to be a vertically downed configuration).
Fig. 21 — Remove the evaporator and drain pan
8. Adjust the mounting parts position according to the direction of
equipment.
Fig. 22 — Adjust the mounting parts position
9. Reinstall the evaporator and drain pan.
Fig. 23 — Reinstall the evaporator and drain pan
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
10. Reinstall T1, T2 sensor plug and tie up the sensor wires.
Fig. 24 — Reinstall T1, T2 sensor plug and tie up the
sensor wires
NOTE: The wire body needs to pass through the wire groove from
the drain pan and applied to the drain pan's hook.
9
Cut the foam
gasket.
Remove knockouts
as shown
Hook the wire into
the buckle and go
down from the wire
slot.
Replace the foam
gasket over wires.