How To Install - Xiaomi G11 User Manual

Hide thumbs Also See for G11:
Table of Contents

Advertisement

How to Install

Installing the Ba ery
Slide the vacuum cleaner along the ba ery track until it clicks into place.
Note: A er installing the ba ery, press the power bu on to turn on the vacuum cleaner.
Click into Place
Removing the Ba ery
Hold the vacuum cleaner in one hand and grasp the ba ery in the other
hand, then press the ba ery release bu on and pull the vacuum cleaner in
the direction shown to separate it from the ba ery.
Installing the 2-in-1 Charging & Storage Mount
• The 2-in-1 charging & storage mount should be installed in a cool and dry
place with an electrical outlet nearby. Prior to installing, ensure that there
are not any wires or pipes in the wall directly behind where the mount will be
installed.
• The bo om of the 2-in-1 charging & storage mount should be at least 115 cm
from the ground.
• Select a suitable installation place and mark the positions of the mounting
holes on the wall.
• Use a power drill with an 8 mm drill bit to drill a hole approximately 40 mm
deep in each marked position, then insert a wall plug into each hole.
• Align the mounting holes on the 2-in-1 charging & storage mount to the holes
on the wall, then a ach the mount to the wall using the included screws.
5
115 cm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents