CONFIGURATION

The configuration process involves the following
procedures and should be completed in the order presented:
1.
Hardware Installation - The Hardware Installation
procedure verifies proper installation of GETC
hardware.
2.
Firmware Installation - The Firmware Installation
procedure provides instructions for installing the
GETC operating firmware.
3.
Software Installation - The Software Installation
procedure provides instructions for installing the
Turbo Board software.
4.
Personality Programming - This step provides
instructions for programming and storing system
configuration data in the GETC.
5.
Operational Checkout - The Operational Checkout
procedure provides instructions for verifying the
GETC operation when the configuration is
complete.

HARDWARE INSTALLATION

Typically, a Station GETC is installed in an EDACS
station cabinet just above each of the station's radio
assemblies as shown in Figure 2. The assembly is mounted
within a slide out shelf measuring 1.75 inches high (one rack
unit) by 19 inches wide.
DISTRIBUTION
DISTRIBUTION
PANEL
SPACE
STATION GETC
STATION GETC
REPEATER
REPEATER
CHANNEL #2
CHANNEL #4
POWER SUPPLY
POWER SUPPLY
SPACE
STATION GETC
STATION GETC
REPEATER
REPEATER
CHANNEL #1
CHANNEL #3
POWER SUPPLY
POWER SUPPLY
REPEATER
REPEATER
CABINET
CABINET
Figure 2 - Typical Five Channel Repeater
DISTRIBUTION
PANEL
PANEL
SPACE
SPACE
SPACE
STATION GETC
REPEATER
CHANNEL #5
POWER SUPPLY
REPEATER
CABINET
Cabinet
Installation or removal of the shelf sub-assemblies
involves sliding the GETC shelf out of the cabinet and into
the service position. This position allows access to the
shelf's sub-assemblies.
appropriate screws, nuts, and washer hardware. Refer to the
MASTR IIe (LBI-38430) or MASTR III (LBI-38636)
Application Assembly Diagrams for detailed information on
installing the GETC Shelf.
Observe basic safety precautions to prevent injury or
equipment damage.

GETC Logic Board Installation

This manual assumes the GETC Logic Board
(19D904266G1 or G4) is previously installed, setup for the
default configuration (Wideband EDACS Station), and fully
operational. If for any reason the GETC Logic board is
suspect, refer to LBI-38894 for detailed instructions for
removing, replacing, and testing the GETC Logic Board or
the Regulator Board.

Turbo Board Installation

This manual assumes the Turbo Board is previously
installed and fully functional.
attempting to install the Turbo Software, the Turbo Board is
suspect refer to LBI-38822 and SRN-1060 or 1062 for
detailed instructions for removing, replacing, and testing the
Turbo Board.

Rockwell Modem Installation

The Rockwell Modem provides a high speed
synchronous serial interface between the Station GETC and
the CEC/IMC's Uplink GETC. The Station GETC uses the
modem to send and receive serial digital data representing
GID information, polling messages, keying messages, and
channel assignments. Data transfer rates are 9600 bits per
second (bps) using dedicated 3002 data grade four-wire
audio lines. Technical specifications for the modem may be
found in LBI-33031. Information on installing and testing
the modem may be found in LBI-38894, and LBI-38822.
Modem Alignment
Use the following steps to set up the basic audio line
levels. If the Station GETC is linked to a multisite system
other than the CEC/IMC (i.e. Data Gateway), different
levels may be required.
installation manual for the required levels.
1.
Ensure jumpers are installed on J11 pins 1 & 2 and
J12 pins 1 & 2.
2.
Apply power to the GETC.
LBI-38988
Install all components with the
If, after installing or
Consult the applicable system
11