Safety Precaution - PrimeVOLT PV 4K6HB-60 User Manual

Single phase ess string inverter
Hide thumbs Also See for PV 4K6HB-60:
Table of Contents

Advertisement

1.2

Safety Precaution

Installation, maintenance and connection of inverters must be performed by qualified personnel, in
compliance with local electrical standards, wiring rules and requirements of local power authorities
and/or companies(for example: AS 4777 and AS/NZS 3000 in Australia).
To avoid electric shock, DC input and AC output of the inverter must be terminated at least 5 minutes before
performing any installation or maintenance.
The temperature of some parts of the inverter may exceed 60℃ during operation. Do not touch the inverter
during operation to avoid being burnt.
Ensure children are kept away from inverters.
Don't open the front cover of the inverter. A part from performing work at the wiring terminal (as instructed
in this manual), touching or changing components without authorization may cause injury
to people, damage to inverters and annulment of the warranty.
Static electricity may damage electronic components. Appropriate method must be adopted to prevent such
damage to the inverter; otherwise the inverter may be damaged and the warranty annulled.
Ensure the output voltage of the proposed PV array is lower than the maximum rated input voltage of
the inverter; otherwise the inverter may be damaged and the warranty annulled.
When exposed to sunlight, the PV array generates dangerous high DC voltage. Please operate according to
our instructions, or it will result in danger to life.
PV modules should have an IEC61730 class A rating.
If the equipment is used in a manner not specified by the manufacturer, the protection provided by the
equipment may be impaired.
Completely isolate the inverter before maintaining. Completely isolate the inverter should: Switch off
the PV switch, disconnect the PV terminal, disconnect the battery terminal, and disconnect the AC terminal.
Prohibit inserting or pulling the AC and DC terminals when the inverter is running.
In Australia, the inverter internal switching does not maintain the neutral continuity and the neutral
continuity must be addressed by external connection arrangements.
Don't connect Three phase hybrid inverter in the following ways:
EPS Port should not be connected to grid;
The single PV panel string should not be connected to two or more inverters.
2
1 Safety
1 Safety

Advertisement

Table of Contents
loading

Table of Contents