Finishing The Outdoor Unit Installation; To Finish The Outdoor Unit Installation; Starting Up The Outdoor Unit; Technical Data - Daikin ROTEX HPSU Bi-Bloc Ultra Installation Manual

Table of Contents

Advertisement

5 Connect an earth leakage circuit breaker and fuse to the power
supply line.
4.7
Finishing the outdoor unit
installation
4.7.1

To finish the outdoor unit installation

1 Insulate and fix the refrigerant piping and interconnection cable
as follows:
6

Technical data

6.1

Piping diagram: Outdoor unit

7.0 CuT
7.0 CuT
7.0 CuT
7.0 CuT
7.0 CuT
7.0 CuT
Y1S
S1PH
k
9.5 CuT
a
Field piping (liquid: Ø6.4 mm flare connection)
b
Field piping (gas: Ø15.9 mm flare connection)
c
Stop valve (liquid)
d
Stop valve with service port (gas)
e
Filter
f
Muffler with filter
RRGA04~08DAV3
ROTEX HPSU Bi-Bloc Ultra
4P496756-1B – 2018.07
h
R2T
4.0 CuT
4.0 CuT
4.0 CuT
M1F
12.7 CuT
12.7 CuT
R3T
12.7 CuT
j
M1C

5 Starting up the outdoor unit

c
a
b
f
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Liquid pipe
e
Liquid pipe insulation
f
Finishing tape
2 Install the service cover.
5
Starting up the outdoor unit
See the indoor unit installation manual for configuration and
commissioning of the system.
R1T
g
g
6.4 CuT
6.4 CuT
g
k
i
15.9 CuT
g
Capillary tube
h
Heat exchanger
i
Accumulator
j
Compressor accumulator
k
Muffler
M1C
Compressor
d
e
f
Y1E
e
c
a
6.4 CuT
6.4 CuT
b
d
15.9 CuT
3D110394
Installation manual
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rotex rrga04dav3Rotex rrga06dav3Rotex rrga08dav3

Table of Contents