Samsung DV6000R Service Manual page 22

Clothes dryer
Table of Contents

Advertisement

22 _ Disassembly and Reassembly
Figure
ORIFICE SPUD
ORIFICE SPUD
NO.43
NO.54 or 55
(LNG)
LEAK
REGULATOR BLOCK
LIMITER
OPEN PLUG
(LNG)
(LPG)
LP
LP
N N
<LNG>
LP
LP
N N
<LPG>
4. Remove the BUNER ORIFICE SPUD and
replace it with matching length ORIFICE
SPUD from Kit.
Check the number of the ORIFICE
SPUD before change it.
5. Reassemble the TUBE BURNER.
(LPG)
6. Remove the LEAK LIMITER from the top of
the pressure regulator.
7. Install REGULATOR BLOCK OPEN PLUG
on top of pressure regulator and tighten
moderately.
8. Loosen the screw securing the shutter, rotate
the shutter until the end of the slot labeled
"LP" contacts the screw. Tighten the screw to
lock the shutter in place.
T he LP gas converted dryer should have
an input of 22,000BTU/hr or 20,000BTU/
hr. with a manifold pressure of 11 in.
W.C.P.(Water Column Pressure).
Description

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents