BPC instruments AMPTS III Operation And Maintenance Manual page 5

Anaerobic batch fermentation test systems
Table of Contents

Advertisement

Always make sure that the gas outlet of the Flow Cell Unit (FCU) is able to release pressure in the event of
pressure build-up inside of the instrument. Do not obstruct or block it.
Always wait 60 seconds between powering the system on and off. This will allow for the operating system to
shut down properly and for the capacitators to properly cycle.
Always use deionized water to minimise the risk of residue or rust forming on the inside of the FCU.
Limited Warranty
The product warranty provided with the instrument corresponds to the stipulations in Orgalime S 2012, unless
otherwise agreed upon with BPC Instruments AB. BPC Instruments AB reserves the right to correct any possible
errors, mistakes, changes, updates, technical data or otherwise relevant information in this manual or any other
documents, where applicable by law.
Electrical Safety
Compliance is required with respect to voltage, frequency and current requirements indicated on relevant parts.
Improper operation, damage to the equipment, fire or otherwise undesired effects might be caused by
connecting to a different power source. There are no user-serviceable parts in the equipment, unless otherwise
agreed upon with BPC Instruments AB.
Before Getting Started
Read this manual before installing and using the instrument. In addition, keep this instruction manual for future
reference and make sure it is easily available for people who regularly use the system.
Contact Information
BPC Instruments
Mobilvägen 10
223 62 Lund
Sweden
E-mail: sales@bpcinstruments.com
Phone: +46 (0)46 163950
Website:
https://www.bpcinstruments.com
Webshop:
https://webshop.bpcinstruments.com
Swedish organisation number: 556687-2460
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMPTS III and is the answer not in the manual?

Related Products for BPC instruments AMPTS III

Table of Contents