Chapter 04: Setting up the Instrument

In order to install the system properly, the steps described below need to be followed:
Step 1: Unpack the instrument and place the thermostatic water bath on a flat and stable
surface.
Step 2: Remove the blue plastic protection on the thermostatic water bath lid, mount the legs
and handles and place the lid on top of the thermostatic water bath.
Step 3: Fix the reactors after adding the samples by following the instructions below:
Step 4: Place the reactors inside the thermostatic water bath. Add a piece of tubing to the
push-in valve and attach it to one of the 2 ports on the lid (the other one is the gas outlet).