BPC instruments AMPTS III Operation And Maintenance Manual page 17

Anaerobic batch fermentation test systems
Table of Contents

Advertisement

Step 7: Add distilled water inside the FCU and place them on the detection unit.
Make sure that each FCU is perfectly seated (horizontally levelled) on the BPC Core AMPTS
Unit. It can be easily observed by checking the FCU level indicator and the level control from
the software or the OLED screen as shown below. Adjustable feet are used to level the
instrument.
The BPC Core AMPTS Unit is equipped with an OLED screen that provides information
regarding the status of the instrument (environmental conditions, time, current IP address
used by the instrument and alignment indicator). This can be accessed through two physical
buttons located below the screen.
17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMPTS III and is the answer not in the manual?

Table of Contents