Selecting A Location - Zodiac E30 iQ Installation And Maintenance Manual

Variable speed pump
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 22
22
20
18
16
14
12
10
8
6
4
2
0
0
3
3. INSTALLATION

3.1 SELECTING A LOCATION

tooltip
tooltip
FILTER
HEATER
CHECK VALVE
(Check Valve recommended)
FIGURE 1 - TYPICAL PIPING INSTALLATION
26
TABLE 5 - PERFORMANCE CURVES
E30 iQ 200
100%
75%
50%
6
9
12
15
18
m3/h
2 m
Recommended
PUMP
Distance
a.
2-WAY
LATERAL
VALVE
SUCTION
POOL
RETURN
Installation and general maintenance manual
21
24
27
30
33
Ceiling height
above skimmer
or walk surface
SKIMMER
a.
MANUAL BYPASS VALVE
MANUAL BY-PASS DETAIL:
36
2.5 m
ZONE 1
- VARIABLE SPEED PUMP

Advertisement

Table of Contents
loading

This manual is also suitable for:

E30 iq 100E30 iq 200Wp000222

Table of Contents