General Site Requirements; Site Preparation; Environment; Figure 2.1 Air Flow Of The Ubigate Ibg1000 - Samsung Ubigate iBG1000 Installation Manual

Hide thumbs Also See for Ubigate iBG1000:
Table of Contents

Advertisement

General Site Requirements

Site Preparation

Before installing an Ubigate iBG1000, ensure that the site conditions comply
with the following requirements and that the mounting equipment, tools, and
cables are available at the designated site.
For safety, Ubigate iBG1000 is intended to be installed in a restricted access
location by a service person.
See Required Tools and Materials for information about tools and materials
required for installation.

Environment

Site location is important for the proper operation of Ubigate iBG1000.
Place the unit in a clean and dry environment with adequate air circulation.
Allow two to three feet additional clearance around the router for access to the
cable connectors on the rear panel.
The selected installation site must meet basic environmental requirements.
The following figure shows a top view of the path of cooling air through the
chassis. Clearance must be maintained near the air intake and exhaust vents to
prevent overtemperature conditions, which could result in router failure or
performance degradation.
© SAMSUNG Electronics Co., Ltd.

Figure 2.1 Air flow of the Ubigate iBG1000

Ubigate iBG1000 Installation Manual/Ed.02
2-3

Advertisement

Table of Contents
loading

Table of Contents