Installation - FIP FLS M9.03 Instruction Manual

Dual parameter flow monitor & transmitter
Table of Contents

Advertisement

INSTALLATION

Mechanical installation
The M9.03 Dual-Parameter Flow Monitor & Transmitter is available just in one
packaging for panel or wall installation. The panel version is installed using
the panel mounting kit (M9.SN1), while the wall mounting version is got fixing
the panel mounting version on the wall mounting kit (M9.KWX). The mounting
kits can be ordered directly connected to the monitor or separately and then
simply installed on it.
Panel installation
Fix instrument on the panel rotating by hand the fixing snails (M9.SN1).
5

Advertisement

Table of Contents
loading

Table of Contents