Stage Alkaline; Stage Uv - NU Aqua Platinum Series Installation Manual

Hide thumbs Also See for Platinum Series:
Table of Contents

Advertisement

System Connections
6 Stage Alkaline Connections
For Product ID (SKU): WU-100GPD-NP-ALK
J
F
A-B
Connect red tubing to the feed water adapter to the inlet of the leak detector.
C-D
Connect red tubing from the outlet of the leak detector to the water inlet of the first stage.
E-F
Connect yellow tubing from the T fitting on the post filter to the tank ball valve.
G-H
Connect blue tubing from the outlet of the alkaline filter to the faucet.
I-J
Connect black tubing from the flow restrictor to the drain saddle.
16
A
H
G
E
I
D
B
C
System Connections
6 Stage UV Connections
For Product ID (SKU): WU-100GPD-NP-UV
A
J
F
A-B
Connect red tubing to the feed water adapter to the inlet of the leak detector.
C-D
Connect red tubing from the outlet of the leak detector to the water inlet of the first stage.
E-F
Connect yellow tubing from the T fitting on the post filter to the tank ball valve.
G-H
Connect blue tubing from the flow sensor on the UV filter to the faucet.
I-J
Connect black tubing from the flow restrictor to the drain saddle.
H
G
E
I
D
B
C
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents