Installation Procedure; Step 1 Checking And Preparing Accessories; Step 2 Choosing The Installation Location - Samsung AG AN4DKH Series Installation Manual

Fan coil unit
Hide thumbs Also See for AG AN4DKH Series:
Table of Contents

Advertisement

Installation Procedure

Step 1 Checking and preparing
accessories
The following accessories are supplied with the product.
Pattern sheet (1)
Insulation pipe
(Liquid side1, gas side1)
Manual (2)
Cable-tie (6)
DB68-11289A-01_IM_DVM FCU WindFree 4way_EU_EN_.indb 7
Step 2 Choosing the installation
location
Installation location requirements
Drain hose (1)
• Air must be distributed optimally.
• The passage of air must not be disturbed.
• Condensation water must be drained easily.
• The support structure must be strong enough
Insulation drain hose (1)
• The ceiling must not be significantly sloped.
• There must be a sufficient space for maintenance and
Air vent hose (1)
• The power and communication cables of the fan
Clamp (1)
Reinforcing the ceiling
Make sure that the ceiling is sufficient to support the
weight of the fan coil unit. If dangerous, reinforce the
ceiling with foundation bolts before installing the fan
coil unit.
Spacing requirements
to support the weight of the fan coil unit. (If the
structure is not strong, the fan coil unit may fall off,
leading to personal injury.)
service.
coil unit must be at least 1 m away from electronic
appliances such as televisions. (Occasionally, more
distance may be required.)
(Unit: mm)
7
English
2022-04-26 오전 8:55:17

Advertisement

Table of Contents
loading

Table of Contents