MAINTENANCE

9.3.15 Coupling replacement and adjustment

➢ Stop the compressor and turn off the power
➢ Remove the protection cover.
➢ Turn the spindle by hand to bring the coupling screws to dismount position, and then take out the
screws.
➢ Remove the damaged coupling elastic element.
➢ This process must be applied at other elastic element which have shown up processing dismount.
➢ The process is replaced by a new coupling before the screws are fully tightened.
➢ Assembly covers again, by protection cover.
After switching power on, check if there is any fault indicator. If you have to fault, turn off the power
and inform our authorized service.
Switch off after the compressor by idling for 1-2 minutes, then again check the system operation.
Rotate the motor again and observe operation first minute very carefully. In the case of any unusual
situation, stop the compressor and inform our authorized service. (particularly rising sharp sound)
Continue to operate the compressor for up to 1 hour to make sure that it is safe.

Figure 29 Coupling Replacement

75