Installing The Node; Strand Wire Mounting - Motorola Starline SG1000 Installation And Operation Manual

Split third port
Table of Contents

Advertisement

4-2
Installation

Installing the Node

Installation procedures include:
S
Installing the housing on the strand
S
Installing the E-pack
S
Splicing the four-fiber service cable to the transportation fiber
S
Installing the pin-type connectors
S
Installing the coaxial and fiber cables
S
Closing the housing

Strand Wire Mounting

Two strand clamps and bolt assemblies are located on top of the housing for normal horizontal
mounting below the strand.
Figure 4-1 illustrates the rear view of the housing, strand clamps, and pedestal mounting holes:
Figure 4-1
Rear view of housing, strand clamps, and pedestal mounting holes
RF
1
RF
2
Strip gauge
SG1000 Split Third Port Installation and Operation Manual
9.96"
Strand clamps
RF
4
RF
3

Advertisement

Table of Contents
loading

Table of Contents