Multiple Priming Valves - Waterous VPO Priming System Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

Safety
Introduction
Connecting the Priming Components
3
5
Product Overview
3
6
6
4
Installation
3
4
6
2
1
|
46
56
Operation
Maintenance

Multiple Priming Valves

Use the illustration and instructions to make the
connections on a multiple priming valve application.
1 Install the outlet muffler if it is suitable to your
application. Alternatively, locally source the
components required in your application to
direct the priming-pump exhaust away from
people to avoid injury and equipment to avoid
damage.
Note: Make sure to use a minimal bend radius
and arrange the hose to allow proper
draining.
2 Install a 3/4-inch NPT fitting with a 3/4-inch
hose connection to the priming pump inlet.
3 Install a 3/4-inch NPT fitting with a 3/4-inch
hose connection to the priming valve outlet.
4 Use a T-fitting with the appropriate terminations
to connect between the priming valve and
hoses.
5 Use an elbow fitting with the appropriate
terminations to connect between the priming
valve and hoses.
6 Use the appropriate hoses to connect the
priming valves to the priming pump. Refer to:
"Hose and Tubing Requirements" on page 25
to select the appropriate hose. Make sure that
you install the hoses so that they drain from the
priming valves to the priming pump.

Advertisement

Table of Contents
loading

Table of Contents