Introduction; About This Manual - Supporting Documents; Glossary; Initial Inspection Of Material List - Duracell D-HUB Installation Manual

Table of Contents

Advertisement

1 Introduction

Throughout this manual, the following symbols will be used to highlight important information and procedures:
Symbol
Definition
WARNING! A dangerous voltage or other
condition exists. Use extreme caution when
performing these tasks.
CAUTION! This information is critical to the safe
installation and or operation of the product.
Follow these instructions closely.
1.1 About this manual – supporting documents
This manual is intended to be used by qualified service and installation personnel for the purposes of installation
and startup only. The DURACELL HUB energy management system & gateway requires installer administration and
device commissioning prior to operation of the ESS. Refer to the Fleet Installer Administration Guide and the
DURACELL HUB Install & Commission Quick Guide for further details.
This product is permanently wired to the home electrical service, and must be installed by a licensed electrician
only. This product is a power distribution peripheral intended to be operated with the ESS. Refer to the DURACELL
POWER CENTER 5KW Installation & Startup Manual for installation of the ESS.
Go to
www.duracellpowercenter.com

1.2 Glossary

Term
Definition
AC / DC
Alternating Current / Direct Current
AHJ
Authority Having Jurisdiction
ARC
Auto Recovery Control
DC
Direct Current
EMC
Energy Management Controller
EMS
Energy Management System
ESS
Energy Storage System
LED
Light Emitting Diode

1.3 Initial Inspection of Material List

The system components supplied with the
DURACELL HUB are shown below. Each
component should be inspected visually for any
damage that may have been caused by
shipment. If parts are missing or damaged,
please contact your local distributor.
Item
Description
1
EMS-A DURACELL HUB
2
Current transformer – 200 Amp
3
Current transformer – 50 Amp
4
EMS to PCS RJ-45 cable
5
AK1 DURACELL HUB control cable
6
USB to Mini-USB service cable
for a complete list of installer resource materials.
Term
NC/NO
Normally Closed / Normally Open
NEC/CEC
National (USA) Electric Code / Canadian Electric Code
PCS
Power Control System (Inverter)
PE (GND)
Protective Earth
PV
Photo-Voltaic
RF
Radio Frequency
SOC
State Of Charge (Battery)
SOH
State of Health (Battery)
1
4
Figure 1: DURACELL HUB materials list.
Symbol
Definition
Function performed by energy
EMS
management system / controller.
NOTE: This statement is important.
Follow instructions closely.
Definition
(x2)
2
5
6
(x3)
3
1

Advertisement

Table of Contents
loading

Table of Contents