4.3.3 Backup Panel Connection
Route "AC Load" L1, L2, Neutral, and Ground to a
dedicated 2-pole backfeed rated breaker in the
backup electrical panel.
4.3.4 ESS: PCS Grid Port Connection
Route "AC_Grid_PCS" L1, L2, Neutral, and
Ground to the PCS Grid port inside the ESS.
4.3.5 ESS: PCS Load Port Connection
Route "AC_Load_PCS" L1, L2, and Neutral to the
PCS Load port inside the ESS.
L1 L2
N
Figure 17: Backup panel connection.
PCS
N
Figure 18 : DURACELL HUB to PCS grid port connection.
PCS
N
Figure 19: DURACELL HUB to PCS backup port connection.
To backup panel
L2
L1
GND
L2
L1
GND
10