LG LV120HCV Installation Manual page 22

Single zone vertical air handling unit - cv
Table of Contents

Advertisement

GENERAL INSTALLATION GUIDELINES
Vertical Downflow Installation
Vertical Downflow Installation - continued
7. Position the rear horizontal bracket on the two vertical brackets and secure with screws (Figure 19).
8. Position the left and right horizontal side brackets and secure with screws (Figure 19). The brackets are not
left/right hand dependent.
9. Position the front horizontal bracket and secure with screws (Figure 19).
10. Confirm all bracket screws are secure and the bracket assembly is correctly positioned to support the evap-
orator coil/drain pan assembly.
11. Route the wiring for the pipe in and pipe out sensors (Figure 20).
12. Carefully slide the evaporator coil/drain pan assembly back into the cabinet (Figure 21). Confirm the assem-
bly is against the rear panel of the cabinet.
13. Reinstall the cabinet support bracket (Figure 22).
Figure 18: Vertical Brackets.
Figure 20: Route Wiring.
Sensor
Wiring
22
Vertical
Bracket
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 19: Horizontal Brackets.
Figure 21: Reinstall Coil Assembly.
Rear
Bracket
Side
Brackets
Front
Bracket
Evaporator
Coil/Drain
Pan Assembly

Advertisement

Table of Contents
loading

Table of Contents