LG LV120HCV Installation Manual page 17

Single zone vertical air handling unit - cv
Table of Contents

Advertisement

Outdoor Unit Platform Requirements
Outdoor Unit Foundation Requirements.
Figure 6: LVU120HCV, LVU180HCV, LVU240HCV, LVU300HCV
Table 5: Outdoor Unit Foundation Specifications.
Outdoor Unit Type
LVU120HCV, LVU180HCV, LVU240HCV, LVU300HCV
Bolting the Outdoor Unit to the Platform
1. Ensure that the concrete platform will not degrade easily, and has enough
strength to bear the weight of the unit.
2. Include an H-beam support. Firmly attach the corners, otherwise the support
will bend.
3. Use a hexagon nut.
4. Use anti-vibration material.
5. Include enough space around the concrete foundation for condensate
drainage.
6. Seal all wiring and piping access holes to prevent insects from entering the
unit.
GENERAL INSTALLATION GUIDELINES
Outdoor Units.
Unit: Inch
Bolt
Type
M10-J
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Concrete Height
Bolt Depth
Minimum 4 inches
Minimum 3 inches
Figure 7: Bolting the Outdoor Unit to the Platform (Piping
Location May Differ Depending on Outdoor Unit Model).
Bolt
Top of Outdoor Unit
Bolt
Refrigerant Pipe
Bolt
Connection Location
(Looking Down)
Bolt
17

Advertisement

Table of Contents
loading

Table of Contents