Download Print this page

Ikan PT4700S-TMW-PEDESTAL Quick Start Manual page 12

17” sdi teleprompter, pedestal & dolly turnkey w/ 19” widescreen talen monitor kit

Advertisement

Assembly Steps
Setting Up the Talent Monitor
Using the shorter 4 x 10mm Screws, attach the VESA Monitor Mount. Make sure that the long end of the VESA Monitor Mount is pointing in the direction
of the power button like the image above. Use the Mounting Knob to tighten the 15mm Rod Adapter to the VESA Monitor Mount. Make sure that the top of
the VESA Mount is flush with the edge of the monitor.
Setting Up the Teleprompter Monitor (Script Monitor from the Teleprompter Base System)
If the mounting brackets where previously installed on the teleprompter monitor, remove those screws. Using the longer 4 x 15mm Screws and 4 x Riser
Washers attach the mounting brackets with the washers between the bracket and monitor like the image below.
www.ikancorp.com | 1.713.272.8822 | sales@ikancorp.com
because we're filmmakers too

Advertisement

loading