Installation - Lang 2F11-CLS-L Installation, Operation, Maintenance, & Troubleshooting

Full size double stack convection oven
Table of Contents

Advertisement

DANGER:
THIS APPLIANCE MUST BE GROUNDED AT THE
TERMINAL PROVIDED. FAILURE TO GROUND THE
APPLIANCE COULD RESULT IN ELECTROCUTION AND
DEATH.
WARNING:
INSTALLATION OF THE UNIT MUST BE DONE BY
PERSONNEL QUALIFIED TO WORK WITH ELECTRICITY
AND PLUMBING. IMPROPER INSTALLATION CAN CAUSE
INJURY TO PERSONNEL AND/OR DAMAGE TO
EQUIPMENT. UNIT MUST BE INSTALLED IN
ACCORDANCE WITH ALL APPLICABLE CODES.
NOTICE:
The data plate is behind the access panel under the
controls. The oven voltage, wattage, serial number, wire
size, and clearance specifications are on the data plate.
This information should be carefully read and understood
before proceeding with the installation.
NOTICE:
The installation of any components such as a vent hood,
grease extractors, fire extinguisher systems, must
conform to their applicable National, State and locally
recognized installation standards.
ELECTRICAL CONNECTION
The electrical connection must be made in accordance with local codes or in the
absence of local codes with NFPA No. 70 latest edition (in Canada use: CSA
STD. C22.1).
The electrical service entrance is provided by a 1 1/4 inch at the bottom of the
oven. Power connections can be made at a service connection behind the access
door.
Oven Voltage
The Lang Model 2F11-CLS-L oven is operated on 400-volt power source. The
Amp draw, KW and rating is listed in the table below.
2F11-CLS-L
L1-L2
6.1
K.W Per Phase
L2-L3
L1-L3
Total
9.1
9.1
24.3
9
Amps Per Line
L1
L2
L3
32.9
32.9
39.4

INSTALLATION

Advertisement

Table of Contents
loading

Table of Contents