Joint Cementing Procedure - Haier GE NF97UM Service Manual

97% upflow/horizontal modulating variable speed gas furnace
Hide thumbs Also See for GE NF97UM:
Table of Contents

Advertisement

VENT
PIPE
Unit
DIA.
(in.)
1-1/2
1
2
070
2-1/2
3
2
090
2-1/2
3
2
110
2-1/2
3
135
3
2 inch to 1-1/2 inch reducer required, must be field provided.
1
* Kit 51W11 is provided with a 1-1/2" accelerator, which must be used for all 45,000 and 70,000 furnace installations. When using 1-/2
in. piping, the pipe must be transitioned to 2 in. pipe when used with the Flush Mount Kit.
+ Termination kits 44W92 and 44W93 approved for use in Canadian installations to meet CSAB149.
++ The 44W92 concentric kit is provided with a 1-1/2" accelerator, which must be installed on the exhaust outlet when this kit is used
with this furnace. When using 1-1/2 in. piping, the pipe must be transitioned to 2 in. pipe when used with the Concentric Kit.

Joint Cementing Procedure

All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
NOTE: A sheet metal screw may be used to secure the
intake pipe to the connector, if desired. Use a drill or self
tapping screw to make a pilot hole.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
1. Measure and cut vent pipe to desired length.
2. Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
NOTE: Check the inside of vent pipe thoroughly for any
obstruction that may alter furnace operation.
3. Clean and dry surfaces to be joined.
4. Test fit joint and mark depth of fitting on outside of pipe.
STANDARD
Outdoor
Outdoor Exhaust
Exhaust
Accelerator
Accelerator
(Dia. X Length)
(Dia. X Length)
1-1/2" X 12"
2" X 12"
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Table 19. Outdoor Termination Kits Usage
Flush
Concentric
Mount Kit
51W11 *
+44W92++
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
5. Uniformly apply a liberal coat of PVC primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
NOTE: Time is critical at this stage. Do not allow primer
to dry before applying cement.
6. Promptly apply solvent cement to end of pipe and inside
socket surface of fitting. Cement should be applied
lightly but uniformly to inside of socket. Take care to
keep excess cement out of socket. Apply second coat
to end of pipe.
7. Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn during
assembly (but not after pipe is fully inserted) to distribute
cement evenly. DO NOT turn ABS or cellular core pipe.
NOTE: Assembly should be completed within 20
seconds after last application of cement. Hammer blows
should not be used when inserting pipe.
8. After assembly, wipe excess cement from pipe at end
of fitting socket. A properly made joint will show a bead
around its entire perimeter. Any gaps may indicate an
improper assembly due to insufficient solvent.
9. Handle joints carefully until completely set.
Page 34
CONCENTRIC
1-1/2"
2"
Concentric
Kit
Kit
71M80
69M29
or
or
+44W92++
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
3"
Concentric
Kit
60L46
or 44W93+
YES
YES
YES
YES
YES
YES
YES
31-5000723 Rev. 0

Advertisement

Table of Contents
loading

Table of Contents