INSTALLATION OF INDOOR

Selection of the best location

Install the air conditioner in the location that
satisfies the following conditions.
- The place shall easily bear a load exceeding
four times the indoor unit's weight.
- The place shall be able to inspect the unit as
the figure.
- The place where the unit shall be leveled.
- The place shall easily connect with the
outdoor unit.
- The place where the unit is not affected by
an electrical noise.
- The place where air circulation in the room
will be good .
- There should not be any heat source or
steam near the unit
Top view
Unit: mm
Air inlet vents
600
Air outlet vents
Front view
Unit: mm
Confirm the positional relationship between
the unit and suspension bolts.
- Installation the ceiling opening to clean the
filter or service under the product.
Inspection hole
600 x 600
Control box
600
1 000
Front
20 or more
INSTALLATION OF INDOOR
Ceiling dimension and hanging
bolt location
Install the unit above the ceiling correctly.
CASE 1
Position of suspension Bolt
- Apply a joint-canvas between the unit and
duct to absorb unnecessary vibration.
- Apply a filter Accessory at air return hole.
E
ZBNQ18GM1A0
Model
ZBNQ24GM1A0
Chassis
M1
A
933.4
B
971.6
C
619.2
D
700
E
30
F
270
G
15.2
H
858
I
201.4
J
900
9
G
J
A
B
H
Drain hole
(Unit:mm)
ZBNQ36GM3A0
ZBNQ36LM3A0
ZBNQ48GM3A0
ZBNQ48LM3A0
ZBNQ60GM3A0
M2
M3
1 283.4
1 283.4
1 321.6
1 321.6
619.2
619.2
700
700
30
30
270
360
15.2
15.2
1 208
1 208
201.4
291.4
1 250
1 250