Pre-Operation Checks - Parsun T50 BM Owner's Manual

Table of Contents

Advertisement

CAUTION
Failure to follow the break-in procedure could result in reduced engine life or even severe
engine Damage.
1. for the first 10 minutes of operation.
Run the engine at the idle speed.
2. for next 50 minutes of operation:
Run the engine at 3000 r/min or at approximately half throttle.
3. for the next two hours of operation:
Run the engine at 4000 r/min or at approximately three-quarter throttle.
4. for the next seven hours of operation:
Avoid continuous operation at full throttle for more than five minutes at a time.
5. Operate the engine normally.
Fuel
·Check to be sure you have plenty of fuel for your trip.
·Make sure there are no fuel leaks or gasoline fumes.
·Check fuel line connections to be sure they are tight.
·Be sure the fuel tank is positioned on a secure, flat surface, and that the fuel line is not twisted or
flattened, or likely to contact sharp objects.

2.3 Pre-operation checks

12

Advertisement

Table of Contents
loading

This manual is also suitable for:

T50 bwT50 fwT60a bmT60a bwT60a fwT60a

Table of Contents