High voltage hazard. Power
off the inverter first before any
operations.
Read through the guide before
any operations.
High temperature hazard. Do
not touch the equipment to
avoid being hurt.
Check Items Before Switching Power ON
No.
The inverter is firmly installed at a clean place where is well-ventilated and easy-to-
1
operate.
The PE cable, DC input cable, AC output cable, and communication cable are
2
connected correctly and securely.
3
Cable ties are routed properly and evenly, and no burrs.
4
Unused ports and terminals are sealed.
5
The voltage and frequency at the connection point meet the on-grid requirements.
Potential risks exist. Wear
proper PPE before any
operations.
Delayed discharge. Wait until
the components are totally
5min
discharged after power off.
N/A
N/A
Check Item
02
EN

Advertisement

loading