GE GEP4.0-3-10 Quick Installation Manual page 14

4-20kw three phase
Hide thumbs Also See for GEP4.0-3-10:

Advertisement

The PV box should be installed when GEP15-3-10 or GEP20-3-10 is used
in Australia only. Install the cover of the PV box after connecting the DC
input cable to the equipment. Otherwise, the DC input cable cannot be
connected.
7
M5
1.2~2N·m
04
Electrical Connection / Elektrische aansluiting /
Połączenia elektryczne / Conexão elétrica
Connecting the PE Cable / PE-kabel aansluiten / Podłączanie przewodu PE /
Conectando o cabo PE
1
L=L1+(1~2)mm
NOTICE
8
L1
13
9
M5
1.2~2N·m