GE GEP4.0-3-10 Quick Installation Manual page 23

4-20kw three phase
Hide thumbs Also See for GEP4.0-3-10:

Advertisement

05
Power On / Inschakelen / Włączenie zasilania / Ligando a alimentação
Power ON
Turn on
2
1
Power OFF
3
1
Turn off
06
Commissioning / Inbedrijfstelling / Uruchomienie / Comissionamento
Commissioning via LCD / Inbedrijfstelling via LCD /
Uruchomienie przez LCD / Comissionamento via LCD
1. Select the right safety country via LCD.
Long press
Select
for 2s
Country/Region
2. Wait for 20s, the inverter will set the safety country automatically and go back to the standby
interface.
ON
3
OFF
Check the LED indicators
3
2
China
COM1
1
Short
press
22
China