Completing Start-Up - Honeywell HCE 40 Additional Instructions For Installation And Operation

Storey controller
Table of Contents

Advertisement

Start-up
Checking assignment of room names
Maximise setpoint temperature at the central operating device (see
operating instructions of central operating device).
The green LED of the assigned temperature zone illuminates.
Actuators which are normally closed may experience a delay
of 15 minutes.
Minimise setpoint temperature at the central operating device (see
operating instructions of central operating device).
The green LED of the assigned temperature zone goes out.
The assignment is correct.
Actuators which are normally open may experience a delay of
15 minutes.

Completing start-up

Closing open setpoint adjusters
Replace cover and snap in both snap locks.
Handing over zoning plan
Hand over the completed zoning plan and the installation instructions
to the customer. Both documents are important, as changes to the
system may be made in future.
44

Advertisement

Table of Contents
loading

Table of Contents