LEFT Peristaltic Pump HEAD (pH)
Repeat, so both tubes are now connected with one end joined to the chemical injection
point, and the other joined to the RIGHT-HAND SIDES (discharge sides) of the chemical
dosing unit pumps.
6.4.1 Connect chemical dosing unit to chemical supply tanks.
Ensure that the supply tanks are positioned no less than 1.5m (5ft) apart.
Figure 5.13
Figure 5.14
RIGHT Peristaltic Pump HEAD (hydrogen
peroxide or chlorine )
OXISWIM MANUAL
P a g e
20 | 45