INSTALLATION PROCEDURE — LARGE COVER
11. Connect the battery cable with the controller
and set the battery in place.
12. Connect the cables of infrared sensor and
controller with the connection cable.
13. Connect the cables of manual button and
controller with the connection cable.
NOTE: It will take 5 minutes after connecting the
battery for the electronics to initialize.
After approximately 30 seconds, the
sensor LED will flash in 4 second intervals
until the initialization completes.
14. Ensure all pipe connections are completely
tightened to prevent leaking.
NOTE: If for any reason it becomes necessary to
remove the control stop make sure the
water is shut off at the main supply valve.
The Flush Valves are preset for flush volume
as marked on the valve carton. The valve
does not require adjustment for variation in
water pressure within its operating range.
15. To set the Flush Valve for proper operation,
open the control stop completely and
activate the Flush Valve several times.
16. In the case of excessive flow rate because
of high water pressure, gradually adjust the
control stop clockwise (towards the closed
position) until there is suitable water flow
into the fixture.
NOTE: Adjust so water amount is not
excessive and waste can flow
properly.
17. Tighten the front cover screws into the
base frame firmly with the hex wrench.
Make sure no cord, wire or chain is
caught between the front cover and base
frame.
Controller
Connection
cable
(sensor)
NOTE: The control stop should never be
opened to the point where the flow
from the Flush Valve exceeds the
flow capability of the fixture. In case
of a valve failure, the water must
NOT overflow from fixture.